Sigma LBA-500PC Instruction Manual

Browse online or download Instruction Manual for Bridge cameras Sigma LBA-500PC. Sigma LBA-500PC Instruction manual User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 13
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Pyxis Lab Inc.
ST-500 Inline
Fluorometer Probe
Instruction Manual
Version 1.3
Pyxis Lab, Inc. 2013
All Rights Reserved
Page view 0
1 2 3 4 5 6 ... 12 13

Summary of Contents

Page 1 - Instruction Manual

Pyxis Lab Inc. ST-500 Inline Fluorometer Probe Instruction Manual Version 1.3  Pyxis Lab, Inc. 2013 All Rights Reserved

Page 2 - Contents

10 The calibration solution could be the sample water itself. The concentration of PTSA in the sample water can be determined with using an offline

Page 3 - 1. Introduction

11 Fill in the z value 400 for 20 mA output in the controller’s mA-to-value conversion setup. This will force the controller to show 120 ppb when th

Page 4 - 3. Specification

12 If the probe output signal is not stable and fluctuates significantly, check and make sure the solution ground is properly connected. Carry out r

Page 5 - 4. Installation

13 Warning 8. Firmware Upgrade The ST-500 probe can be upgrade to ST-500B via firmware upgrade. ST-500B stores 1000 last measured data points, d

Page 6 - Designation

2 Contents 1. INTRODUCTION ...

Page 7

3 1. Introduction The Pyxis ST-500 inline fluorometer probe measures the concentration of fluorescence tracer PTSA (pyrenetetrasulfonic acid) in w

Page 8 - 5. Probe Calibration

4 Model Output and Main Features Availability ST-500 4-20 mA current output, Modbus RTU via RS-485, calibration via PC interface Available ST-500B D

Page 9

5  Cable Length: 5 feet, terminated with IP67 connectors  Power consumption: 52 mA at 24 V  Dimension: Length 6.8 inch (172.7 mm), body diamet

Page 10

6 Follow the wiring table below to connect the ST-500 probe to a controller. The ST-500 probe is a three-wire, non-loop powered, 4-20mA device. It n

Page 11 - 7.1. General Maintenance

7 Do not connect the solution ground to the power ground! 4.2. Connection to a Computer and Other Devices 4.2.1. Connect to a computer Figure 3

Page 12

8 Figure 4. Connect to DC-200 graphic panel The DC-200 graphic panel can be powered by a separate 24 VDC power supplier or by the 24 VDC from the

Page 13 - 8. Firmware Upgrade

9 Double click the Probe Configurator icon to launch the program. If the probe is connected to the computer properly, the Probe Configurator softwar

Comments to this Manuals

No comments